top of page

REGULATORY COMPLIANCE & DOCUMENTATION

Zolacon provides technical documentation and compliance support for utility infrastructure projects that must meet evolving federal, state, and local standards. From FERC 881 to NESC safety code and city-specific utility requirements, we ensure that every submittal is accurate, aligned, and review-ready.


We help your team stay ahead of permitting timelines and avoid rework by proactively addressing documentation gaps, clearance calculations, and multi-agency compliance.


  • FERC 881 & Thermal Ratings Compliance:
    Review and validate PLS-CADD transmission models
    Ensure conductor clearance envelopes meet regulatory thresholds
    Compile support files for engineer and agency review


  • NESC (National Electrical Safety Code) Checks:
    Validate vertical and horizontal clearances
    Review structures for compliance with safety code rules (Rule 232, 233, etc.)
    Ensure transmission and distribution drawings meet NESC Table specs


  • Permit & Submittal Package Support:
    Prepare utility relocation exhibits and approval forms
    Align documentation with DOT and municipal standards
    Submit in accordance with each agency’s formatting and routing requirements


  • As-Built Integration & Redline Review:
    Incorporate field notes and survey data into plan/profile sheets
    Update drawing sets with construction modifications
    Maintain clarity and consistency across all final deliverables

bottom of page