
REGULATORY COMPLIANCE & DOCUMENTATION
Zolacon provides technical documentation and compliance support for utility infrastructure projects that must meet evolving federal, state, and local standards. From FERC 881 to NESC safety code and city-specific utility requirements, we ensure that every submittal is accurate, aligned, and review-ready.
We help your team stay ahead of permitting timelines and avoid rework by proactively addressing documentation gaps, clearance calculations, and multi-agency compliance.
FERC 881 & Thermal Ratings Compliance:
Review and validate PLS-CADD transmission models
Ensure conductor clearance envelopes meet regulatory thresholds
Compile support files for engineer and agency review
NESC (National Electrical Safety Code) Checks:
Validate vertical and horizontal clearances
Review structures for compliance with safety code rules (Rule 232, 233, etc.)
Ensure transmission and distribution drawings meet NESC Table specs
Permit & Submittal Package Support:
Prepare utility relocation exhibits and approval forms
Align documentation with DOT and municipal standards
Submit in accordance with each agency’s formatting and routing requirements
As-Built Integration & Redline Review:
Incorporate field notes and survey data into plan/profile sheets
Update drawing sets with construction modifications
Maintain clarity and consistency across all final deliverables
.png)